← Back to Home
Drywall Estimator
Sheets, Tape & Mud (Level 3)
0
Sheets (4x8)
0
Tape Rolls (500')
0
Mud (4.5G Box)
Assuming 10% waste for board. For Level 3, you'll need approx 0.0 gallons of compound.
*Estimates dependent on installation skill. Level 5 finish requires significant extra material.
Legal Disclaimer
The results provided by this tool are for estimated planning purposes only. While we strive for accuracy, specific local codes, material variations, and site conditions may significantly affect actual requirements. Always consult with a licensed professional before purchasing materials or beginning construction. We are not responsible for any financial loss, structural issues, or construction errors resulting from the use of this tool.